Home of the Pure H2O Co GWT, Global Water Treatment across the globe.

PROJECT

HOME  / PROJECT / CASE STUDY

SHANGHAI CHEMICAL INDUSTRY PARK, CHINA

Shanghai Chemical Industry Park (SCIP) is a 700 hectare purpose built development supporting global chemical industry demands for highly efficient manufacturing infrastructure. High purity water required for central power generation and industrial use is an Anglo-Sino achievement.

PROJECT DETAILS

45,000m3/d All Membrane Desalination

25,000m3/d Industrial Water

20,000m3/d High Purity Water

 

PROCESS + ENGINEERING

Pure H2O GWT (Heritage)

 

PROJECT MANAGEMENT

Enersave Group

 

EPC

Gold Water (Shanghai)

 

Power generation at Shanghai Chemical Industry Park is Combined Cycle. High Purity Water provides boiler feed and reduction of NOX (Greenhouse Gas) emissions together with export water to industry.

KEY FEATURES

RAW WATER FEED PUMPS

Incoming feed water from the tank farm is drawn into the Feed Water Pumpset suction from a header. High level delivery header drops to floor level and exits the pumphouse to a below ground distribution trench.

HEAT EXCHANGERS

Within the Water Treatment Building below floor level trenches are utilised extensively to make maximum use of available space. Extremely efficient fabricated steel Heat Exchangers use the high latent heat capacity of superheated steam to maintain 625cum/hr of feed water at a constant 25oC with a minimal footprint.

ULTRA FILTRATION

Packaged Ultrafiltration System approximately 7 metres high comprising of two banks each with 14 pressure vessels each containing 4 UF elements. Total capacity per skid is 625 cubic metres per hour.

CHEMICAL HANDLING

Central Bulk Chemical Storage Tanks and bunded area open to atmosphere for venting purposes. Covered to protect from sunlight and rain.bic metres per hour.

CHEMICAL DOSING ROOM

Chemical Dosing Stations comprising Tanks and Duplicate Pumpsets. Floor is sealed and bunded to contain spillage.

REVERSE OSMOSIS FEED PUMPS

Suction connections rise from below floor header. Since each pump is dedicated to a bank of membranes and each system is sequentially controlled automatic valves are fitted. Pumps are multi-stage end suction type. Outlet pipework is stainless steel

REVERSE OSMOSIS

Membrane banks arranged as two: one array. 7 metre long pressure vessels each containing 6 Filmtec BW8040 membranes.

TANK FARM

All tanks are constructed from carbon steel plates and are of welded assembly. Tank linings vary to suit the stored materials. Water tanks are epoxy coated internally.

POWER ROOM

Water treatment plant MCC and PLC racks in the Power Room

Looking for World Leading Solutions for your Water Project?

GET STARTED NOW

ABOUT

The global water ttreatment specialists, The PureH2O Co GWT

Experience, technological performance and innovation combine to produce world leading water solutions.

"This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies." Privacy policy. OK